Three (3) Crucible – Pre-Heating Stations
Built 2008
Each crucible pre-heating stations is equipped with one (1) natural gas burner. Each burner has a capacity of 350 kW.
Built 2008
Each crucible pre-heating stations is equipped with one (1) natural gas burner. Each burner has a capacity of 350 kW.